Skip to main content
Regional validity

Scope

Building physical assessment

Fire performance REI from inside
REI from outside
60
30
maximum ceiling height = 3 m; maximum load Ed,fi = 35,0 kN/m  
Classified by HFA  
Thermal performance U 0,35 W/(m2K)
Diffusion adequate
Calculated by HFA  
Acoustic performance Rw (C;Ctr) 57 dB (-2; -7)
Ln,w (Cl)
Rating by TU-GRAZ  
Mass per unit area m 85,9 kg/m2
 

data sheet external wall
awmoho02a-02 (pdf, 250 KB)

Note

When using cross laminated timber:
Variation 00-03: d ≥ 78,0; at least 3-layers, top layer at least 25mm; variation 04: d ≥ 94,0; at least 3-layers, top layer at least 30mm

Only for registered members after logging in.
solid wood construction
Cross-section of standard configuration
solid wood construction
Standard configuration

Register of building materials used for this application, cross-section (from outside to inside)

Thickness [mm] Building material Thermal performance Reaction to fire­klasse EN
λ μ min – max ρ c
A 20,0 larch wood external wall cladding 0,155 150 600 1,600 D
B 30,0 spruce wood battens 0,120 50 450 1,600 D
C vapour-permeable membrane sd ≤ 0,3m
D 120,0 multilayer wood wool composite board (WW-MW-WW) 0,049 2-5 130 1,000 B
E 80,0 solid glued wood (e.g. cross laminated timber) 0,130 50 500 1,600 D
F 12,5 gypsum fibre board or 12,5 mm DF 0,320 21 1000 1,100 A2

Ecological rating (per m2 construction area)

Database ecoinvent

Built-in renewable materials 56,0 kg
Share of renewable materials of total weight 67,49 %
Global warming potential (GWP-T) -32,590 kgCO2Äqv.
Energy use of Primary Energy 760,3 MJ
Share of renewable Primary Energy 9,3 %
∑ΔOI3 54,9
Calculated by HFA  

Global warming potential Share of renewable Primary Energy Resources
Lifecycle
Phase
GWP-F
[kgCO2Äqv.]
GWP-B
[kgCO2Äqv.]
GWP-T
[kgCO2Äqv.]
PERE
[MJ]
PERM
[MJ]
PERT
[MJ]
PENRE
[MJ]
PENRM
[MJ]
PENRT
[MJ]
AP
[kgSO2Äqv.]
EP
[kgPO4Äqv.]
ODP
[kgR11Äqv.]
POCP
[kgEthenÄqv.]
A1 - A3 49,756 -82,346 -32,590 70,334 789,481 859,815 689,919 19,804 709,723 0,275 0,094 3.016942E-6 0,104

Last update 02.08.2023/nu.ge